Portable Equipment
Portable and temporary power use
Submersible & Pump Cables
H07RN8-F is a harmonised heavy-duty water-resistant flexible rubber cable for submersible pumps and electrical equipment in wet environments. Common constructions use IEC 60228 Class 5 copper conductors, EI4 rubber insulation, and an EM2 water-resistant elastomeric sheath. Permitted immersion depth, water temperature, fluid compatibility, conductor temperature, and approvals must be confirmed for the selected product.

In-house capability
Constructions are designed around movement, environment, and electrical duty.
Materials, dimensions, marking, and finish held under in-house manufacturing control.
In-house laboratory checks verify the agreed construction and project acceptance requirements.
Development can start from a drawing, specification, cable marking, or physical sample.
Family profile: immersion depth, water temperature, fluid compatibility, dimensions, and approvals are model-specific.
Product anatomy
Use the available structure, operating values, and design references for project screening. Final values are confirmed against the reviewed quotation documents.
Confirmable specifications at a glance

Cable construction
Configuration data
Use these values for project screening. Final construction, dimensions, quantity, reel length, and availability require engineering confirmation.
Fit for your duty
For submersible pumps, wells, drainage, water treatment, dewatering, and wet industrial equipment within the selected model's immersion and fluid limits.
Applications and duties
Portable and temporary power use
Fixed routing and equipment wiring
Portable, mine, and industrial pumping equipment
Wet use, pumps, and underwater applications
Outdoor power, sunlight, and weather exposure
Compliance and documents
Design references
Design references do not establish product certification. Confirm the ordered construction, marking, test scope, and destination requirements during quotation.
Supply and customization
Customization scope
Before you quote
Short answers for engineering and procurement. The reviewed quotation and its document list govern the final supply scope.